Project progress

Projectmanserver

Highlights

Recent activity

Work progressed

ProjectMan Loro audit fixes for conflict retries, hosted browser coverage, and safe processing diagnostics have passed independent source review.

The campaign is addressing concrete owner workflow and reliability problems while preserving history and privacy.

Work completed Feature

ProjectMan replication R3 is qualified and merged: operator controls, fresh-key rotation, and safe recovery/rejoin.

Completes the operator and recovery gate on the isolated Loro integration branch. No production replication activation or merge into Dev occurred.

Work completed Feature

ProjectMan can now initiate authenticated two-way replication contacts with durable retry and restart recovery.

The outbound contact foundation is no longer blocked on CI, enabling the next artifact and recovery-material transfer gate. This is code integration, not production activation or real-node pilot qualification.

Work progressed

Published the two replication audit repairs: bounded history browsing and restart-safe fair processing. Both exact heads passed independent source review; hosted qualification is queued.

History browsing limits reconstruction to the displayed page and preserves scoped legacy precedence. Processing advances durable bounded sweeps so early completed or unavailable requests cannot indefinitely starve later work. Review findin…

Work blocked

Merged qualified replication dev-sync PR118; PostgreSQL test provisioning stopped on inherited production PUBLIC read privileges.

Replication integration is c82ce0a. PR120 has new-base source review but awaits hosted validation; PR122 PostgreSQL acceptance cannot safely use the proposed shared-cluster test login. No production permissions or application deployment ch…

Older updates